Back Pressure
High enough to stop screw retreat.Tune to machine and grade for shear during screw rotation within machine limits.
Follow purging-compound flow from hopper through screw and barrel out the nozzle — with the Baseline Protocol and a check sequence that makes site trials compare cleanly.
Key note: This visual explains principles, not fixed machine settings — verify grade, temperature range, TDS and machine manual before real use.
Controlled terms so screw and barrel purge in the same cycle, with systematic before-after comparison.
Tune to machine and grade for shear during screw rotation within machine limits.
Hold the screw forward during screw-rotation cleaning.
Start at production speed, then assess flow and discharge state.
Hold starting temperature inside the ASACLEAN grade range before moving to the next resin temperature.
Sequence stresses separating old resin, cleaning the system, checking discharge, and prepping for the next resin.
Drain hopper and barrel resin until no old material flows, avoiding needless ASACLEAN dilution.
Wipe hopper and feed zone free of old-resin pellets, color and dust.
Feed ASACLEAN into the barrel and rotate per the Baseline Protocol to carry material through screw channels and nozzle.
Catch discharge in a safe tray; track color, black residue and contaminants to improving trend per defined criteria.
Shift to the next resin temperature without leaving the ASACLEAN grade range still in the machine.
Re-check hopper and feed throat so no ASACLEAN or debris mixes into production resin.
Same as the cleaning round, pushing leftover ASACLEAN out of the barrel.
Confirm even-colored flow with no visible old resin, carbon or contaminants.
Feed next resin and check first parts to color, speck, size, surface and plant quality criteria.
Start with the Screw Rotation Method for general barrel and screw purging; Short Injection adds flow through nozzles or dead spots when needed — operators must confirm fitness before use.
Send resin type, temperature, screw size, observed problems and Hot Runner structure for CSC grade and trial-plan assessment.