Dead spots
Direction-change corners and areas around plugs or valve pins can trap old resin.
Glass-fiber-free is the first condition — but resin, manifold and nozzle temperature, gate, valve pin and mold maker advice must still be checked before purging compound enters the system.
Judge purging by parts from every cavity — each branch differs in residence time and gate opening.
Direction-change corners and areas around plugs or valve pins can trap old resin.
Long-held resin in hot zones may degrade and shed black specks later.
Each drop replaces old color at a different pace, so record results per cavity.
Small gates and nozzles make purging-compound limits and steps matter more.
Glass-fiber grades such as NewEX, RX and PX2 must never pass Hot Runner; gates and fine flow parts are at risk. RX is Not yet available in Thailand.
Check barrel, nozzle and manifold, not one setpoint, plus the next resin temperature.
Check the Hot Runner and mold maker manual, gate opening method and specific bans before every start.
Pick by cleaning goal, old and new resin, temperature and residue needs — never by grade name alone.
Verify the Asahi Kasei product lineupThe maker lists RU as the all-purpose grade balancing cleaning power and residue, for sealing and Hot Runner.
For low residue including some low-temp engineering plastics; maker-listed for Hot Runner.
Focused on system rinse-out and low-residue jobs; maker lists sealing and Hot Runner use.
Glass-fiber-free formula with high thermal stability and less fuming; maker-listed for sealing and high-temp Hot Runner.
Property summaries above come from the Asahi Kasei Product Lineup page as reviewed — not a confirmation that any grade fits every mold.
Pressure, speed, shot and gate-opening details must follow machine, mold and grade documents — never fixed web values.
Check the Hot Runner manual and mold bans before passing foreign material through the manifold.
Time, material and shots until every cavity passes, before ASACLEAN.
Ready the barrel, screw and nozzle before judging the Hot Runner section.
Use confirmed grade and parameters with gates and valves verified working.
Displace with next resin, record per-cavity results, stop at defined pass criteria.
This content screens and prepares trial plans, not a running SOP — operators must follow machine, Hot Runner mold, product documents and plant safety measures.
Technicians use this data to screen grades and verification items — never one formula for every system.